Predictive versus preventive maintenance

Deferred maintenance refers to postponing maintenance tasks — whether planned or unplanned — usually due to lack of budget. Over time, deferred maintenance tasks accumulate, creating a maintenance backlog.

Keeping a maintenance backlog has long been accepted as normal; however, regularly deferring maintenance comes with risks. As the maintenance backlog continues to grow, it becomes more difficult to get caught up and prioritize tasks effectively. With deferred maintenance, important tasks can fall through the cracks, and small problems can escalate to equipment failure if they are not addressed in a timely manner.

Some companies have even chosen a run-to-failure maintenance strategy that allows machines to continue operating until they fail. However, this practice accelerates equipment wear, reduces asset lifespan, and increases the risk of unexpected failure and downtime. Often, deferred maintenance costs more time and money than simply keeping up with maintenance would have cost in the first place.

Fortunately, Computerized Maintenance Management System (CMMS) software makes it possible to keep your maintenance both up-to-date and on budget.

Now that we’ve outlined the broad strokes, let’s take a closer look at the specific factors that contribute to deferred maintenance and how modern management tools offer viable solutions.

When Can Maintenance Be Deferred?

There are few compelling reasons to routinely defer maintenance for long periods — an approach that generally leads to increased time and resource expenditure. However, specific circumstances may justify a temporary deferment, such as aligning maintenance schedules with operational priorities or budget cycles.

These scenarios often fall into two main categories:

  • Strategic Deferred Maintenance
    Strategic deferred maintenance involves deliberately postponing less critical maintenance tasks to allocate resources to more urgent ones. For non-critical components, it may make sense to allow a machine to operate until failure. This strategy is used when the downtime caused by a failure does not significantly disrupt operations or when the cost of preventive maintenance outweighs the cost of replacing the unit. It requires robust preparation, including having the necessary parts and personnel ready to manage failures effectively and minimize downtime.
  • Involuntary Deferred Maintenance In contrast, involuntary deferred maintenance occurs due to uncontrollable factors such as sudden budget cuts or unexpected resource constraints. This type of maintenance deferment is unplanned and can lead to a cascade of issues where minor problems escalate, leading to major disruptions and increased repair costs.

What pushes an organization towards one of these types of deferred maintenance? Here are the contributing factors.

Start your CMMS Journey Today:

CMMS Software
  • No hassle custom consultation
  • Personalized one-on-one demo
  • Information relatant to your application

Reasons for Deferred Maintenance

  • Budget Constraints
    There are many reasons organizations choose to defer maintenance, but the leading reason is cost. When financial resources are tight, maintenance managers often need to make difficult choices about which tasks to prioritize. High-priority tasks with significant maintenance criticality might take precedence, while less urgent repairs and replacements are postponed. Although deferring maintenance might seem like a short-term solution, it’s important to consider the long-term consequences to your budget. Emergency repairs, which are far more expensive than routine maintenance, often result from deferred tasks. Moreover, unplanned downtime can leave workers idle and halt production, leading to substantial productivity losses.
  • Inefficient Decision-Making
    Even when additional funding can be requested, slow approval processes can delay maintenance activities. If it takes weeks for management to approve necessary funding, pending tasks can easily accumulate in the maintenance backlog. Efficient decision-making and swift approvals are crucial to prevent maintenance deferrals.
  • Company policies
    Even for companies that don’t intentionally operate a run-to-failure strategy, hold orders can be placed on work for any number of reasons, hindering the team’s ability to proceed with a maintenance task.
  • Lack of planning
    Poor planning frequently results in a lack of resources, whether parts or technicians, to complete maintenance tasks on time, leading to them being deferred. For example, without proper spare parts inventory management, teams may not have replacement parts on hand, which can lead to tasks being put on the back burner as they can not be completed until the parts can be ordered and delivered.
    Similarly, insufficient staffing can leave teams without the required personnel to complete maintenance tasks on time. Additionally, certain analysis or repairs may be too complex for the existing team, necessitating the use of third-party contractors, who may not always be available and can be expensive.
  • Unforeseen Emergencies
    Unexpected events can divert attention and resources away from routine maintenance tasks. Emergencies might require reallocating funds from planned maintenance to address the immediate issue. For example, if critical medical equipment malfunctions, ensuring safety for technicians would take precedence over non-urgent maintenance tasks like servicing a functional HVAC system.
  • Lack Of Expertise
    The value of specialist skills can’t be over emphasized when it comes to maintenance. Having personnel in-house or access to people with knowledge to identify problems before they become difficult to solve is critical. Spotting maintenance needs may require specific skills or training that are worth investing in.
  • Staffing Levels
    Another barrier to identifying maintenance needs is stretching personnel levels too thin.  Without sufficient staff, maintenance teams may forgo routine checks that could find potential problems early. Baked-in time for overhaul and asset inspection shouldn’t be overlooked.
  • A Corrective Maintenance Mindset
    Relying solely on corrective maintenance, which addresses issues as they arise, can also contribute to deferred maintenance. Without a proactive maintenance plan, identifying the root cause of breakdowns becomes challenging. Additionally, budgeting for corrective maintenance is difficult, as the costs are unpredictable and can escalate quickly without proper data and documentation.
  • A Lack Of Performance Data
    Repairs can easily slip through the cracks and be neglected without a metrics-driven approach and an effort to track maintenance KPIs.

Now that we know what might cause maintenance to be pushed back, let’s shift gears and look at how to spot when it’s actually happening.

Recognizing the Signs of Deferred Maintenance

The signs of deferred maintenance vary hugely by industry, asset, and function.

Here are a few universal symptoms of equipment needing maintenance:

What to Watch Out For

  1. Noises – a piece of equipment might make a different sound, such as clanking, or become louder.
  2. Odor – a burning, gas, or mold smell, or anything else that might cause you to wrinkle your nose.
  3. Vibrations – if equipment is shaking or shuddering.
  4. Heat – machinery can get hot and overheat before it fails.
  5. Leaks – if any fluid is coming out of equipment.
  6. Shabbiness – any visible wear and tear, including rust, peeling paint, and cracks.

Spotting any of these signs suggests it’s time to schedule maintenance work. If more than one appears at the same time, it’s indicative of a deferred maintenance backlog.

Of course, a specialist may identify numerous other indicators of deferred maintenance — the above list is not exhaustive.

The key is to look out for signs and respond with scheduled checks. Ignoring them could lead to serious repercussions.

What Are the Risks of Deferred Maintenance

Across industries, key risks of delaying maintenance include:

  • Cost of Repairs: Delaying maintenance can lead to more expensive emergency repairs. Additionally, the cost of spare parts will likely increase over time due to inflation.
  • Reduced Overall Equipment Effectiveness (OEE): Postponing necessary repairs can decrease equipment effectiveness.Deferred maintenance can result in lower machine availability, disrupted production schedules, and compromised product quality.
  • Safety Risks: Improperly maintained equipment can pose significant safety hazards, increasing the likelihood of accidents and potential OSHA violations and expensive fines.
  • Asset Degradation: Delaying maintenance can reduce the lifespan and value of assets, even leading to premature equipment failure and lower ROI.
  • Compliance Issues: Maintenance delays can lead to safety regulation violations or breaches of building codes, which could result in legal action, fines or shutdown.
  • Loss of Revenue: Unexpected operational downtime resulting from deferred maintenance can hurt output and profit. Companies can also lose business clients or customers due to reputational damage.
  • Reduced Well-being: When vital assets are not functioning to their intended standards, excessive noise or other signs of wear can negatively impact working conditions and in turn, personnel well-being.

Strategies to Address Deferred Maintenance Backlog

It’s important to have a strategy when addressing a deferred maintenance backlog.

It can help to carefully audit your maintenance requirements and prioritize tasks on the basis of importance, safety, and primary objectives.

Once the above has been established, it is sensible to construct and implement a maintenance strategy.

It can be helpful to use a Computerized Maintenance Management System (CMMS) to help you keep track of, allocate and schedule tasks and resources.

Let’s break it down into steps:

1. Diagnostic Audit

List all necessary maintenance tasks, including details of the assets involved, necessary equipment, materials or tools required to solve the problem. You might need the help of your team or a maintenance technician to get all the information required to run a diagnostic audit.

2. Risk Assessment

Safety is always a top priority. Once you’ve audited the tasks in hand, it’s time to consider the impact postponement may have. This should include potential hazards, such as the risk to your staff, the general public, or the environment.

3. Prioritization

Once you’ve established the most immediate risk, from the basis of both safety and operational impact, it’s time to prioritize. Conduct emergency maintenance based on the criticality of each task.

4. Resource Allocation

Direct the workforce, materials and budget towards the highest priority tasks as soon as possible. It might help internal decision-making to calculate the cost of maintenance tasks against the cost of asset replacement should it fail after further deterioration.

5. Utilize Technology

If possible, now is the time to invest in technology like CMMS or Internet of Things (IoT) sensors to help you monitor equipment more strategically and respond to potential failures or risks more quickly. A CMMS enables you to schedule tasks, track activities and resources, manage inventory, and record real-time data that can be analyzed to pre-empt downtime.

6. Root Cause Analysis

Once the immediate risks in terms of safety and business objectives have been resolved, it’s time to learn from what went wrong. Conduct regular meetings with staff, maintenance technicians, and other stakeholders to share information, advice, and analysis. Clear communication, two-way feedback, and a culture of openness will help your team better anticipate future problems.

Implement Preventive Strategies

Choosing a proactive, preventive, or predictive maintenance approach can effectively help you reduce your deferred maintenance backlog by flagging problems before they escalate, scheduling regular checks, and using data and software to inform maintenance decisions before issues become critical. This approach can improve organizational reliability, boost the lifespan of assets, and head off unexpected downtime or expensive emergency repairs.

Example of Deferred Maintenance: Denver International Airport

At Denver International Airport (DIA), a vivid example of the challenges and consequences of deferred maintenance unfolds. Despite billions spent on expansions, the airport has struggled with maintaining its existing infrastructure. A city audit revealed that the airport has fallen behind on maintaining its buildings and equipment, with more than 7,000 maintenance tasks backlogged over three years.

This maintenance neglect has led to out-of-order escalators and moving walkways, impacting the flow of passengers and the overall functionality of the airport. The maintenance team, understaffed by 23%, has been diverted often to emergency repairs, which leaves routine inspections and preventive work unaddressed.

The situation at DIA illustrates the snowball effect of deferred maintenance: minor issues escalate into major disruptions, costing more in the long run due to emergency repairs and decreased equipment life expectancy. The airport’s focus on large projects while neglecting basic upkeep serves as a cautionary tale of the importance of balancing expansion with the essential task of maintenance.

5 Steps to Decrease Deferred Maintenance

Looking at the repercussions at DIA, it becomes clear that effective management strategies are crucial to prevent similar outcomes. Here are key steps to consider implementing at your facility — while some may be obvious suggestions, others might be less apparent but equally crucial.

  • Step 1: Log Maintenance Activity
    Centralizing data around assets, equipment, work requests, and work orders is critical for reducing a deferred maintenance backlog. Investing in a CMMS or EAM system captures crucial information like wrench time, time to complete, maintenance costs, and warranties, which are helpful for audits and ROI cases.
  • Step 2: Conduct an Audit
    Gathering data allows you to audit the scale of maintenance-related issues. Key questions to consider include whether there are warranties about to expire, the frequency and unpredictability of equipment failures, and the safety threats or impacts on staff and production.
  • Step 3: Prioritize the Backlog
    Categorize the backlog into immediate and delayed attention tasks. Use criteria like cost, time to repair, asset lifecycle, and repair dependencies to prioritize effectively.
  • Step 4: Start or Increase Preventive Maintenance (PMs)
    Preventive maintenance tasks are crucial for avoiding emergency and deferred maintenance. CMMS systems facilitate easy PM scheduling, customized checklists, and runtime-based PMs.
  • Step 5: Secure Additional Budget
    Show where your current budget is allocated to secure additional funds. Demonstrate how investing in maintenance saves money in the long run by avoiding costly repairs and downtime.
Understanding Maintenance KPIs eBook download image

How to Combat Deferred Maintenance with CMMS and IIoT 

Computerized Maintenance Management System (CMMS) software helps maintenance teams keep on top of work orders and scheduling, as well as monitoring maintenance KPIs to be sure work is being completed on time.

IIoT devices, like condition monitoring sensors, can be installed on your machines to automatically collect key data, like changes in vibration and temperature that indicate the health of your equipment. Data analytics software can then analyze sensor data to make accurate predictions about your equipment’s maintenance requirements. 

These technologies become your eyes and ears, giving you visibility into equipment performance and maintenance requirements based on data from the machines themselves. This allows you to prioritize maintenance more effectively and reduce the risks of deferred maintenance. 